New Starts
Statements of Interest (SOI) are currently being requested for the projects listed below. SOI’s are due by 3:00 PM on the date noted on the schedule. Click on the Detailed Narrative below for a description of the project, scope of required professional services, prequalification requirements and key personnel requirements. A separate SOI must be submitted for each project. SOI’s shall be limited to not more than two (8 ½ X 11) pages, with a font of at least 11 pts; and include, at a minimum, the following information: Name of firm with address and contact information; contact person for the firm; statement indicating firm’s interest in the project; a summary of projects similar in scope and magnitude recently completed by the firm; a list of proposed key staff who would be assigned to the project; and a list of proposed sub consultants, if any.
Description | Department | Detailed Narrative | |
---|---|---|---|
040-Various Water Treatment Testing Services 2023 | FM | Submit | |
040-On-Call Electrical Engineering Services 2023 | FM | Submit | |
040-Various Structural Design Engineering Services-Bridge &/or Retaining Wall Repairs | DOT | Submit | |
040-Central Signal System Network Support | DOT | Submit | |
040-2024 Pavement Maintenance Construction Engineering | DOT | Submit | |
040-Professional Engineering Services for Water Allocation | PW | Submit | |
040-Professional Design Engineering Process Control & Infrastructure | PW | Submit | |
040-Professional Engineering Services for Wastewater Treatment Plant Permit Renewal | PW | Submit | |
040-On-Call Inspection and Design Engineering for Stormwater Facilities | SW | Submit | |
040-On-Call Land Surveying Services |
SW | View RFP | Submit |
040-Stormwater Capital Assessment Evaluation | SW | Submit
|