2023 Construction Program
This year’s Program incorporates the County's priority to maintain our existing infrastructure while at the same time implementing projects to improve safety and relieve congestion. In 2023, approximately 71 lane miles of County highways are proposed to be patched and resurfaced to improve rideability and to extend the service life of the existing pavements. The roadways include:
- Army Trail Road from County Farm Road to 84th Court
- Army Trail Road from Schmale Road to IL 53
- Wehrli Road/College Road from 75th Street to Maple Avenue
- Eola Road from I-88 to IL 56 (Butterfield Road)
- Ferry Road from Eola Road to IL 59
- Jewell Road from County Farm Road to Gary Avenue
- Maple Avenue from IL 53 to Belmont Road
- Midwest Road / Summit Avenue from I-88 to IL 38 (Roosevelt Road)
- River Road from Ferry Road to Warrenville Road
Other major projects include:
- Bloomingdale Road over the Canadian National Railroad (bridge replacement)
- Geneva Road over the West Branch of the DuPage River (bridge replacement)
- Illinois Prairie Path (Volunteer Bridge) over the Union Pacific Railroad (raise bridge)
- Lemont Road from 83rd Street to 87th Street (intersection improvements and resurfacing)
- Naperville Road from Naperville-Wheaton Road / Ridgeland Avenue to Diehl Road (intersection improvements and resurfacing)
- Warrenville Road over the East Branch DuPage River (bridge replacement)
The 2023 Proposed Construction Program totals $55,250,000 (all fund sources).
To view the 2023 Proposed Construction Program, click on the following link:
DuPage County Roads Currently Under Contract and/or Under Construction
For Additional Information
Call the main office at 630-407-6900 (M-F 8 a.m. to 4:30 p.m.) or click on Project Details link below for more details.
Updated:
Thursday, March 2, 2023
Project Location(s)
- County Highway 25 Meyers Road over I-88 Reagan Tollway
- County Highway 32 Mill Street over I-88 Reagan Tollway
- County Highway 33 75TH Street over East Branch DuPage River
- County Highway 34 31ST Street over Salt Creek
Short Description of Work
The project consists of minor bridge deck repairs and applying a thin polymer overlay to the surface
Traffic Control
Long term lane closures will be utilized at each bridge. The work will be staged to complete the work in each direction.
Contract Cost
$1,459,743.33
Completion Date
Spring 2023
Construction Status
- County Highway 32 Mill Street over I-88 Reagan Tollway-Construction is scheduled to begin on week of March 6, 2023.
Plans, Special Provisions and Bid Details
Link to plans, special provisions and bid details
Function/Role | Responsible Party |
---|---|
Contractor | ERA-Valdivia Contractors, Inc. 11909 South Avenue O Chicago, IL 60617(773)-721-9350 |
Resident Engineer | Bowman Consulting Group 1001 Warrenville Road, Suite 110 Lisle, IL 60532 |
Project Engineer | Thomas Hardy, P.E. DuPage County Division of Transportation (630)-407-6900 |
Designer | H.W. Lochner, Inc. 225 West Washington Street 12TH Floor Chicago, IL 60606 |
Updated:
Wednesday, March 8, 2023
Project Location(s)
- CH 2 Hobson Road - Washington St to EB DuPage River
- CH 35 55th Street - Holmes Ave to County Line Rd
- CH 40 Yackley Avenue - Oak Hill Dr to Warrenville Rd
Short Description of Work
This project is a part of DuPage Counties yearly pavement maintenance program to resurface multiple roadways and improve ride quality. Work that will be performed includes: curb and sidewalk repairs; drainage repairs; pavement resurfacing; and new pavement markings.
Traffic Control
The project will be constructed primarily using daily lane closures.
Contract Cost
$4,572,458.59
Completion Date
July 15, 2023
Construction Status
- Hobson Road:
- The Hobson Rd location has been completed.
- Yackley Avenue:
- The Yackley Ave location has been completed.
- 55th Street:
- Saw cutting in preparation for various curb replacement, drainage repairs and sidewalk replacement work has been completed.
- The 55th Street location will resume work beginning June 12, 2023.
Plans, Special Provisions and Bid Details
Link to plans, special provisions, and bid details.
Function/Role | Responsible Party |
---|---|
Contractor | K-Five Construction Corporation 999 Oakmont Plaza Drive, Ste. 200 Westmont, IL 60559 (630) 267-5600 |
Resident Engineer | ESI Consultants, Ltd. |
Project Engineer | Keith Warf DuPage County DOT (630) 407-6900 |
Updated: Tuesday, February 21, 2023
Project Location(s)
County Highway 33 75th Street
Between Millbrook Drive and Greene Road
Short Description of Work
The project involves intersection improvements at four locations along 75th Street including:
- The addition of eastbound and westbound right turn lanes at Modaff Road, Olympus Drive, and Greene Road.
- The addition of an westbound right turn lane at Millbrook Drive.
- Eastbound and westbound left turn lane modifications at Modaff Road, Olympus Drive, and Greene Road.
- Replacement of the traffic signals at Millbrook Drive, Modaff Road, Olympus Drive, and Greene Road.
- Sidewalk and curb ramp improvements at Millbrook Drive, Modaff Road, Olympus Drive, and Greene Road.
Traffic Control
Short term overnight lane closures will be utilized at each intersection to construct the improvements. The work will be staged to complete the construction of the right turn lanes first, followed by the left turn lane modifications. The new traffic signals will be constructed utilizing daily lane closures.
Contract Cost
$4,524,976.55
Completion Date
80 Working Days are allowed per the special provisions.
Construction Status
- Work began the week of April 11, 2022.
- Temporary traffic signals have been installed at all four intersections.
- The temporary signals were turned on at Millbrook Dr. and Modaff Rd on 5/19.
- The temporary signals were turned on at Olympus Dr. and Greene Rd on 5/20.
- The contractor has completed the construction of the new right turn lanes, left turn lane extensions, and sidewalks at all four intersections
- The electrical contractor has completed removal of the existing traffic signals and installation of the underground components for the new traffic signals at all four intersections.
- Installation of the remaining above ground traffic signal equipment have resumed and is anticipated to be complete by early May.
Plans, Special Provisions and Bid Details
Link to plans, special provisions, and bid details.
Function/Role | Responsible Party |
---|---|
Contractor | Alliance Contractors, Inc. 1166 Lake Avenue Woodstock, IL 60098 (815) 338-5900 |
Resident Engineer | BLA, Incorporated 333 Pierce Road, Suite 200 Itasca, IL 60143 |
Project Engineer | Steve Mlynarczyk, P.E. DuPage County Division of Transportation (630) 407-6900 |
Designer | Bowman Consulting Group, Ltd. 1001 Warrenville Road Suite 110Lisle, IL 60532 |
- Updated: Tuesday, February 21, 2023
Project Location(s)
County Highway 31: 87th Street/Boughton Road (from the Costco entrance to east of Havens Drive)
County Highway 56: Woodward Avenue (from 87th/Boughton to 700' north)
Woodward Avenue (non-County Highway portion) (from 87th/Boughton to Union Street)
Short Description of Work
The project includes pavement widening in order to provide an additional left turn lane in the northbound, eastbound, and westbound directions (since there are already single left turn lanes, they will become dual left turn lanes) and additional right turn lanes in the eastbound and westbound directions at the 87th/Boughton and Woodward intersection. Work also includes a new traffic signal at this intersection, traffic signal modifications at the Costco entrance, storm sewer improvements, sidewalk improvements, lighting modifications, and retaining walls.
This project is a joint effort between DuPage County and the Illinois Department of Transportation.
Traffic Control - Pre-Stage: Daytime lane closures will be used while temporary traffic signals are installed, and existing raised medians are removed and replaced with temporary pavement.
- Stage 1: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will be closed in each direction as work is performed on the north and east sides of the roads.
- Stage 2: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will remain closed in each direction as work is performed on the south and west sides of the roads.
- Stage 3: Approaching the 87th/Boughton/Woodward intersection, traffic lanes will be shifted and one thru-lane will remain closed in each direction as work is performed on the medians.
- Stage 4: As the roadway is milled and resurfaced, lanes will be opened to the final configuration.
Contract Cost
4,371,729.42
Completion Date
110 Working Days
Construction Status
Several utilities are required to relocate their facilities during or prior to the road work. Utility relocations have not been completed.
Pre-Stage work has been completed. Stage 1 will resume in Spring 2023.
Plans, Special Provisions and Bid Details
Link to plans, special provisions, and bid details.
Function/Role | Responsible Party |
---|---|
Contractor | Alliance Contractors, Inc. 1166 Lake Ave. Woodstock, IL 60098 (815) 338-5900 |
Resident Engineer | STV, Inc. Chicago, IL |
Project Engineer | Kent Kuper, P.E. DuPage County Division of Transportation (630) 407-6900 |
Designer | Engineering Resource Associates, Inc. Warrenville, IL |