C.H. 2 and C.H. 38 (Hobson Road and 63rd Street) Sidewalk

Project Letting Details

Letting Date Section Project
April 29, 2022(IDOT Letting) 16-00146-00-SWContract No. 61G89  C.H. 2 and C.H. 38 (Hobson Road and 63rd Street) Sidewalk

Status

  • Advertised on March 28, 2022

Advertisement

    • Link to the current IDOT procurement page
    • Link to the IDOT Transportation Bulletin which includes projects advertised for IDOT (state)
    • Bulletin Date: Friday, March 25, 2022
    • Description:Contract No. 61G89 DuPage County District 1Section 16-00146-00-SW FAU Route 3567 (Hobson Road) and FAU Route 1518 (63rd Street),     Project no. 3P1R(750), New sidewalk installation, earthwork, drainage system revisions, new retaining walls, and the upgrade of existing traffic signals at the Hobson Road at Woodridge Drive intersection and the 63rd Street at I-355 entrance ramp and exit ramp intersections in Woodridge, Illinois, includes 133 unit tree removal; 959 cu yd furnished excavation, 419 cu yd earth excavation; 21 cu yd removal and disposal of unsuitable material; 3 cu yd trench backfill, 2,036 cu yd topsoil excavation and placement; 4,319 sq yd sodding, 1,041 sq yd sodding, salt tolerant; 4,150 ft perimeter erosion barrier; 28 inlet filters; 3,773 sq yd aggregate base course, type b 2"; 1,276 lb bituminous materials (prime coat); 106 lb bituminous materials (tack coat); 36 ton HMA binder course; 36 ton HMA surface course; 24,789 sq ft PCC sidewalk 5"; 717 ft combination curb and gutter removal; 277 sq ft sidewalk removal; 130 sq ft median removal; 1,486 sq ft segmental concrete block wall; 130 ft storm sewers class A; 5 ea inlets type A; 4 ea manholes; 717 ft combination concrete curb and gutter; 38 ft steel plate beam guardrail; 580 ft thermoplastic pavement marking line; 271 ft underground conduit, galvanized steel; 9 handholes; 7,943 ft electric cable in conduit, signal; 16 ft concrete foundation; 1 ea temporary traffic signal installation; 2,620 ft remove electric cable from conduit; 460 ft pedestrian rail;  454 ft sewer removal;  451 ft concrete coping; federally funded.(A Special Provision for this contract requires insurance that names additional insureds)(50 Working Days)(Job No. C-91-293-16)

Plans, Special Provisions, Proposals, and other forms: